Login Form



Stop the 424 Links PDF Print E-mail
Official Project Websites

Online version of the MTO comment sheets distributed at the PICs. Printable versions in our "MTO Supplied" for bth Brantford and Cambridge.
http://www.24corridorstudy.ca/comment_sheet.html

Website specifically created as a public service announcement media.
http://www.24corridorstudy.ca/

Totten Sims Hubicki Associates. Company hired by the MTO to provide Highway analysis
http://www.tsh.ca/

Interesting Reading

407. "highway 407 was classified as a rural freeway for design criteria purposes"......"However, accounting for the potential for growth in the vicinity of Highway 407 in the Toronto setting, Stage 2 (eight lanes) and Stage 3 (10 Lanes) could be considered urban."
"Although Highway 407 was classified as "rural", it appears that some of the design was carried out as though it were "urban", although this is not explicity expressed in the design criteria."
www.peo.on.ca/publications/407report/chap5.htm

Colorado. Similar in nature to our problem. Lots of great detailed info.
http://www.trainsnotlanes.com/